RM-GCC Company is implementing a number of projects related to energy field in order to cover all the needs of the Iraqi cities. Our projects, which start in the tender bidding stage and end in the handing-over stage, are controlled carefully by a highly trained and skillful staff of engineers and technicians.

Year Client End-User Project Description Gallery
1 1999 Ansaldo Energy Co. Rehabilitation of 2-unit 220MW capacity each
( as a sub contractor )
View Gallery
2 1999 Ministry of Industry Rehabilitation of steam boiler  with capacity of 80 ton /Hr.( as a sub contractor ) View Gallery
3 2001 Ministry of Oil Construction of Crude oil steel storage tanks with capacity of 2 X 3000 M3 View Gallery
4 2001 Ministry of Industry Rehabilitation of boiler  60 Ton/Hr. capacity View Gallery
5 2002 Ministry of Industry Rehabilitation of 6 Boilers 60 Ton/ Hr. capacity View Gallery
6 2003 Ministry of Oil Dismantle of one complete Boiler 90 ton/hr  capacity and install new Boiler 160 Ton/Hr. capacity View Gallery
7 2003 Babcock International Co. Rehabilitation of unit 5 & 6 boilers 580 ton/Hr. capacity each as well as all related auxiliary work View Gallery
8 2003 Ministry of Electricity Installation of 2 LFO storage tanks 5000 M3 capacity View Gallery
9 2004 Washington Group

( GE Supervision)

Electro-Mechanical erection services of  8 gas  turbine units manufactured by GE 25 MW capacity View Gallery
10 2004 Bechtel Co. Rehabilitation of 5 thermal  units no. 1,2,3, 4 & 6 ( 220 MW capacity each) View Gallery
11 2006 Municipal of Baghdad Supply of High & Low voltage switchgears. View Gallery
12 2006 Ministry of Electricity Rehabilitation services of boiler 580 Ton / Hr. capacity each  for unit 3& 4 /Dura power plant View Gallery
13 2007 Bono Co. Complete construction of  new boiler ,150 ton/ Hr.  in Dura oil refinery /Dura power plant View Gallery
14 2007 Hitachi Co. Full site technical assessment services of unit 1 & 3 Hitachi Boilers for JICA – Japan View Gallery
15 2007 Ministry of Oil Supply and Install LV 400 V Switchgears MCC & SCADA. View Gallery
16 2008 Ministry of Oil Supply and Install (7) units of 3.3 KV Substation. View Gallery
17 2008 Ministry of Industry Supply of Electrical Control Devices. View Gallery
18 2008 Ministry of Electricity Condenser Re-tubing Services of Thermal Units no. 1 to 6 View Gallery
19 2010 MOS Co. Supply, installation and operation of printing lab electronic boards for PCB. View Gallery
20 2010 Ministry of Electricity Full replacement work of two lifting pumps station with capacity of 8.2 M/Sec View Gallery
21 2011 Ministry of Electricity Supply of (2 x 31.5 MVA)( 33/11KV) Substations equipment with spare parts. View Gallery
22 2011 Ministry of Oil Supply of 3.3 KV switchgears. View Gallery
23 2011 LSis Co.
(Project no.49)
Performing of construction, installation,  commissioning & testing of No.  35 Substations (2 x 31.5 MVA)( 33/11KV) AIS  to MOE . View Gallery
24 2011 LSis Co.
(Project no.251)
 commissioning & testing of 4 132/33 KV AIS & GIS substations, to MOE . View Gallery
25 2012 Ministry of Electricity Supply of (6000) LV MCCB 250 A with panel box. View Gallery
26 2012 Ministry of Electricity Supply of (3500) LV 250 A MCCB with  panel boxes. View Gallery
27 2012 LSis Co.
(Project no.11)
Performing of biggest SCADA project in Iraq of (7DCC’S Project) control center (Construction, Installation, Commissioning and Testing). View Gallery
28 2012 Ministry of Oil Supply of LV 3.3, 0.4 KV main distribution power center. View Gallery
29 2012 LSis Co.
(Project no.01)
Performing of construction, installation, commissioning & testing of No. 35 Substations (2 x 31.5 MVA)( 33/11KV) AIS & GIS to MOE . View Gallery
30 2013 MOE /Energy Transfer Four 132/33 KV Substation View Gallery
31 2013 WARTSILA Co. Complete Construction works for HFO  Diesel power plant with capacity of ( 4 X 6 MW ) manufactured by WARTSILA View Gallery
32 2014 ARADAT Co. Rehabilitation of  chemical separation tower type O6H1B View Gallery
33 2014 BONO Co. EPC steam boiler 150 ton/Hr. manufactured by Bono – ITALY View Gallery
34 2014 LSis Co.
(Project no.4)
Performing of (120000) Electrical Power Smart-meters, for account of Ministry of Electricity. View Gallery
35 2014  Al Bahar Co. Performing testing of 33/11 KV movable S/S. View Gallery
36 2014 Housing & Construction Co. Performing testing of 33/11 KV. Kut Housing Project supply & Erect Kiosk View Gallery
37 2013 Hanwha Co. Perform overhead 33KV transmission and distribution line 33KV works in Bismaya project. View Gallery
38 2013 Hanwha Co. Installation , testing commissioning, earthing system, cable rout and miscellaneous for 33/11KV substation of Bismaya project. View Gallery
39 2015 Hyosung Co. Tests for 132/33 KV Substations. View Gallery
40 2018 Siemens Co. Rehabilitation of  unit 3 Turbine and generator
/ Al-Mussaib TPS
View Gallery